Correct Electrical Grounding
Department of Veterans Affairs
Correct Electrical Grounding
VA Amarillo, TX
Role: Prime Engineer
Project Features:
Provide Contract Drawings, Specifications, Construction Cost Estimate, Engineering Calculations, and subsequent Construction Period Services to correct existing electrical system with many deficiencies and outdated modifications throughout the facility including:
Buildings 1, 4, 7, 9, 11, 12, 14, 20, 21, 26, 28, 29, 32, 34 and 46 require upgrades for various transformers, conductors, breakers, panels, disconnect switches, control centers, etc., to be provided clearance as required by NEC Article 110.26.
Provide fully developed Contract Drawings on AUTOCAD Version 2010 or newer and provide DWG and PDF drawings.
|