phoenix.jpg (Md:350x109)Upgrade Campus Utilities

 

Department of Veterans Affairs

Upgrade Campus Utilities

VA Phoenix, AZ

Role: Prime Engineer

 

 

Project Features:

 

Provide construction documents which meet the budgetary, contractual and programmatic requirements of PVAHCS for the continued effort of upgrading and modernizing the facilities utility infrastructure. The design shall be separated into multiple construction projects:

1. Upgrade Utility Service and Standby Power

a. Provide design and all required prep work to install two MV standby generators to support expected facility capacity noted in item b, above to include any improvement to the facility fuel system as required to support VA required 96 hours run time.

2. Electrical Infrastructure

a. Replace and relocate various electrical panelboards throughout the facility to include basement areas, Building 2 and others as designated. Replace and relocate CP-2

3. Construct mezzanine and correct remaining deficiencies within Building 2

4. Correct lighting and HVAC throughout all mechanical and electrical spaces throughout the facility.

Areas will be evaluated individually to determine cooling requirements.

5. Correct and upgrade normal and emergency feeders serving Bldg 1, 2, 8, 16, and outlying buildings as required to support current and planned projects per VA master plan.

6. Upgrade electrical system in Bldg 1 to accommodate requirements for the new construction and renovations per VA master plan. (New Rehab, ED Expansion, New OR, New SPD, and renovation of existing areas to meet VA guidelines)

7. Update existing facility electrical master plan.

8. Create an updated facility single line, site plan and master plan to account for all ongoing and planned changes. This shall incorporate all existing electrical studies and surveys.

9. Cost Estimate: A detailed cost estimate will be developed. The estimate will reflect materials, systems, and labor with particular focus on the phasing that the general contractor will need to schedule for.

AES Group, Inc.

 

 

Colorado

11031 S. Pikes Peak Dr.

Suite #202
Parker, CO 80138

(303) 841-3922
(877) 247-0762
Fax: (303) 841-3772

 

 

 

Services

 

Mechanical Engineering

Electrical Engineering

Structural Engineering

Civil Engineering

Architecture

Interior Design

LEED/Green Globes

Cost Estimating 

Project Management

Construction Management

Code Compliance

Energy

GSA Advantage

 

GSA Advantage

 

AES Group is a GSA Professional Engineering Services Contractor

Authorized Federal Supply Schedule

Affiliates

 

OpenWater-Banner-2016.jpg(Orig:195x72)

 

ASCE

 

nceees-logo2x.png(Sm:155x46)

ACEC

 

GSA Advantage

 

SAME

Connect With Us

 

Like Us on Facebook!