Please Wait...

(303) 841-3922  |  11031 S. Pikes Peak Dr. Suite #202  |  Parker, CO 80138

Like Us on Facebook!  View Us on Google!

HOME | ABOUT US | PROJECTS | SERVICES | GSA SERVICES CONTRACT | CONTACT US
MENU



CALL
CONTACT
FIND

 

Construction Management Services

for Phase 3 Seismic Corrections and Renovations Bldg 1                                                      FinalAerialPhoto02-28-2016.jpg(Md:350x254)

 

Department of Veterans Affairs

CM Services Phase 3

VA San Juan, PR

Role: Prime Engineer

 

 

Project Features:

 

AES is providing detailed construction Scheduling services, one full time on-site Structural Engineer, and one full time Safety professional to assist the Senior Resident Engineer (SRE) in monitoring and inspecting the construction activities for compliance with contract requirements and industry standards. The period of performance is 3 years. The magnitude of construction cost is between $50,000,000.00 and $100,000,000.00.

 

 

 

The overall scope of construction includes four (4) main stages:

 

 

 

Site Preparation: construction fencing, fuel oil piping removal, crane erection.

 

 

 

Deconstruction of the Existing Bed Tower: consists of deconstruction of existing levels 4, 5, 6, 7, 8, 9, penthouses level 1 and level 2 and roof. Prior to commencement of tower deconstruction an extensive safety system must be prepared and implemented to isolate the hospitals 24/7 operation from the construction/demolition activities. These lower levels contain essential health care operation that will remain in operation during the execution of this project.

 

 

 

Seismic damping/bracing of structural bays to the Podium: 45 locations within the basement level through level 2 that will receive structural seismic bracing or column stiffening. These areas of disturbance will require disconnecting and or relocating various utilities and include lead and asbestos abatement.

 

 

 

Interior Renovations: Basement level work includes - canteen refrigeration, canteen staging, and corridor and shelled out swing space needs. Approx. – 5,665SF

 

b. Level one work includes - new canteen kitchen and dining, new main corridor, new main lobby/heroes hall, new urology clinic, public restrooms, and Volunteer Service Suite. Approx. – 35,806SF

 

c. Level two Renovation includes -New Union Offices and a bridge leading to the adjacent Bed Tower. Approx. – 2,472SF

 

d. Level three Renovation includes -New IRM Department including a shelled out computer room for future use. Approx. – 16,121SF

 

 

 

AES Group, Inc.

 

 

Colorado

11031 S. Pikes Peak Dr.

Suite #202
Parker, CO 80138

(303) 841-3922
(877) 247-0762
Fax: (303) 841-3772

 

 

 

Services

 

Mechanical Engineering

Electrical Engineering

Structural Engineering

Civil Engineering

Architecture

Interior Design

LEED/Green Globes

Cost Estimating 

Project Management

Construction Management

Code Compliance

Energy

GSA Advantage

 

GSA Advantage

 

AES Group is a GSA Professional Engineering Services Contractor

Authorized Federal Supply Schedule

Affiliates

 

OpenWater-Banner-2016.jpg(Orig:195x72)

 

ASCE

 

nceees-logo2x.png(Sm:155x46)

ACEC

 

GSA Advantage

 

SAME

Connect With Us

 

Like Us on Facebook!