Project Features:

Provide findings and recommendations for Building 430 HVAC systems. The 31,000 square foot building was installed in 1985. The building is in a secure area of the facility, and site escorts were required. Over the years, the building use included the radar system mainframe computers. After the mainframe computers were removed, the HVAC system was sized inappropriately for office personnel use. The computer sub floor assembly had been removed in some areas and air flows were not balanced. Several parameters studies include: